Guided tour of the Zmutt hydroelectric plant

Outlook/iCal

Information

Between 1961 and 1964, at the far end of the Matter Valley, a 74m-high water barrier was constructed, damming up the waters from the surrounding glaciers and streams. The Zmutt pumping station built there is now the highest-capacity station feeding the Grande Dixence Dam. Every season, four pumps send around 140 million m³ of water through a tunnel into the hydroelectric plant.

An expert guide will show you how the Zmutt hydroelectric plant works and you can see a 3D model of the Grande Dixence Dam around Zermatt.

- Meeting point: 10:00 hrs at the Grande Dixence plant entrance in Zmutt
- Register before Wednesday, 15:30 hrs in the Zermatt tourism office or online
- The tour is in German and French.

Online registration

Getting there

Calculate the route

Cookie confirmation

Aufgrund Ihrer Sicherheitseinstellungen müssen Sie bestätigen, dass die eingebundene Seite ein Cookie zur Bereitstellung der Buchungsfunktionalität speichern darf.