The date of this event lies in the past. show all events »

Guided tour of the Zmutt hydroelectric plant

Outlook/iCal

Information

Between 1961 and 1964, at the far end of the Matter Valley, a 74m-high water barrier was constructed, damming up the waters from the surrounding glaciers and streams. The Zmutt pumping station built there is now the highest-capacity station feeding the Grande Dixence Dam. Every season, four pumps send around 140 million m³ of water through a tunnel into the hydroelectric plant.

An expert guide will show you how the Zmutt hydroelectric plant works and you can see a 3D model of the Grande Dixence Dam around Zermatt.

- Meeting point: 10:00 hrs at the Grande Dixence plant entrance in Zmutt
- Register before Wednesday, 15:30 hrs in the Zermatt tourism office or online

Online registration

Getting there

Calculate the route